top of page

Transport - 9m Mandela Sculpture - Union Buildings - Pretoria - 2013

Prior to the loading for transport, the Client once again had to approve and for this the sculpture was completely assembled in a vertical position. After a succesful sign-off by the client, the arms and head were removed in preparation for the transport. At 4400kg the weight was not a problem. However the road restrictions (height & width) had to be considered. The figure was supported in a custom made steel & wood cradle with arms and head seperately packed and strapped. The 1670 kilometers from Cape Town to Pretoria was covered in a modest and safe time of about 22 hours.

The Client

  • Department of Arts and Culture -

Minister Paul Mashatile

Tel:  +2712 441 3691

E-mail: AliciaM@dac.gov.za

 

  • Koketso Growth -

 

Dali Tambo

CEO – National Heritage Project & Koketso Growth

Sony Music Building, 45 Jan Smuts Ave, cnr The Valley Road, Westcliff, Johannesburg

Tel: +27 (0) 11 646 5595 / 3642 / 8385

Mobile: +27 (0) 82 561 0084

dali@nhpc.co.za / dtambo@koketso.co.za

 

André Prinsloo

      s c u l p t o r

© 2014 ANDREPUBLICSCULPTURES. All Rights Reserved.

Created by WilDeCat

  • Facebook - Grey Circle
  • YouTube - Grey Circle
  • Pinterest - Grey Circle
  • Instagram - Grey Circle
bottom of page